CEP Digital Hampton RoadsDigital Infrastructure Radar

By CEP Digital · Published: September 1, 2026 at 8:00 AM ET · Updated: September 1, 2026 at 8:00 AM ET

Free Weekly Intelligence Brief · September 1, 2026

This week's public digital-infrastructure signals

A weekly public scan of Hampton Roads data-center, subsea-cable, fiber, utility, industrial-power, permitting, and digital-infrastructure signals.

26
Qualifying signals
97
Candidates screened
22
High confidence

permit / construction signal · 3 this week

permit / construction signal Active high confidence Current evidence

Building permit: INTERIOR ALTERATIONS - BATHROOM REMODEL / NO CHANGE TO OCCUPANCYBathroom renovation...

INTERIOR ALTERATIONS - BATHROOM REMODEL / NO CHANGE TO OCCUPANCYBathroom renovation to include replacing fiberglass shower with tile shower, new vanity, new commode, and tile floor. All fixtures are staying in the same...

Virginia Beach Permits · Virginia Beach · broad timing: 2026/08/17
permit / construction signal Active high confidence Current evidence

Mechanical permit: Remove existing RTU, install new, remove old duct, install new, (1) new bath exhaust...

Remove existing RTU, install new, remove old duct, install new, (1) new bath exhaust, (2) air curtains, low voltage wiring

Virginia Beach Permits · Virginia Beach · broad timing: 2026/08/13
permit / construction signal Active high confidence Current evidence

Electrical permit: Replacing existing equipment inside Sewage Pump Station. No Service Upgrades, No...

Replacing existing equipment inside Sewage Pump Station. No Service Upgrades, No additional Circuits being Added*Replacing the existing Transfer switch and Existing Generator with New Equipment -- these will be...

Virginia Beach Permits · Virginia Beach · broad timing: 2026/07/06

public procurement opportunity · 3 this week

public procurement opportunity Award Notice high confidence Current evidence

Ship Service Turbine Generator OEM Sole Source

Ship Service Turbine Generator OEM Sole Source Award Notice

Federal buyer · Virginia 23709 · broad timing: 2026-09-01
public procurement opportunity Special Notice medium confidence Current evidence

Notice of Intent to Sole Source - National Integrated Ballistic Information Network Triage

Notice of Intent to Sole Source - National Integrated Ballistic Information Network Triage Special Notice

Federal buyer · Virginia 22102 · broad timing: 2026-09-08T14:00:00+00:00
public procurement opportunity Solicitation medium confidence Current evidence

SOLE SOURCE EVOQUA WATER TECHNOLOGIES LLC CHOROPAC POWER SUPPLY

SOLE SOURCE EVOQUA WATER TECHNOLOGIES LLC CHOROPAC POWER SUPPLY Solicitation

Federal buyer · Virginia · broad timing: 2026-09-01T21:00:00+00:00

PJM transmission / grid-capacity infrastructure · 2 this week

PJM transmission / grid-capacity infrastructure EP high confidence Ongoing context — not a current weekly lead

Modify protection and communication work to support interconnection of new AC2-079 generator

Modify protection and communication work to support interconnection of new AC2-079 generator

Dominion · Suffolk · broad timing: 2019-12-31
PJM transmission / grid-capacity infrastructure EP high confidence Ongoing context — not a current weekly lead

Modify protection and communication work to support interconnection of new AD2-085 generator

Modify protection and communication work to support interconnection of new AD2-085 generator

Dominion · Suffolk · broad timing: 2021-11-30

The free report shows the map. The paid report marks where to dig.

Both tiers come from the same weekly scan. The difference is whether you spend your own hours working out which signals matter to your business — or start from a ranked readout where that work is done.

Free weekly report

What you can already act on

  • Selected meaningful projects with organization, broad location, stage, and timing
  • Public source links for every signal — verify anything yourself
  • Weekly activity metrics and a dated archive
  • Enough to know what's moving in the region

What the paid report adds

  • complete qualifying signal set with ranking
  • buyer/vendor relevance and likely vendor categories
  • project maturity, confidence, dependencies, risks, and conflicting evidence
  • pursue / engage / monitor / ignore recommendation with source-backed reasoning
  • buyer-specific matching for electrical, fiber, low-voltage, cooling, construction, security, backup-power and site-selection teams

See a real entry from this week's paid report →

Want this matched to your firm, or every week without re-ordering? See the three ways to buy →